    National Cancer Center, Clinic building

  • Indoor wiring

    National

    Data center construction results: 25 locations nationwide

    Case Studies

    ■Construction test example 1

    ・Building scale: 1 basement floor, 4 stories above ground, 1 story in the wing, total floor area 39,000 m2
    ・Outline of equipment: Special high voltage transformer 66kV/6.6kV 20MVA-2 units
          Generator equipment: 5,000kVA-3 units
          UPS equipment: 1,000kVA-8 sets
          PDU equipment: 250kVA-50 sets

     

    ■Construction test example 2

    ・Building scale: 4 floors above ground, 1 floor in the building, total floor area 22,320 m2
    ・Outline of equipment: Special high voltage transformer 66kV/6.6kV 15MVA-2 units
          Generator equipment: 4,500kVA-3 units
          UPS equipment: 550kVA-31 sets, 500kVA-3 sets
          PDU equipment: 500kVA-46 sets, 100kVA-4 sets

     

    ■Construction test example 3

    ・Building scale: 3 stories above ground, 1 building, total floor area 15,000 m2
    ・Outline of equipment: High-voltage transformer 77kVA/6.6kV 7.4MVA-2 units
          Generator equipment: 4,000kVA-3 units
          UPS equipment: 1,000kVA-6 sets
          PDU equipment: 500kVA-12 sets

     

    ■Construction test example 4

    ・Building scale: 1 basement floor, 5 floors above ground, 1 floor in the building, total floor area 13,700 m2
    ・Outline of facilities: Special high voltage transformer 66kV/6.6kV 30MVA-2 units
          Generator equipment: 7 units of 6,000kVA