Power supply network spreading across Japan

Our external line business is centered on overhead power lines that transmit electricity and train line facilities that connect cities and people. We connect electricity, deliver electricity, and light up people’s lives. We do this safely, making full use of the experience and technology we have accumulated over the past 90 years.

  • Transmission business

  • Transport business

Transmission business

  • 1.Main equipment list

    Name Specification Quantity
    Jib crane 36t-m class 7 groups
    Climbing crane 36t-m class 5 groups
    10t -m class 1 group
    Extension line car φ 1.5m, electric winder 12 units
    φ 1.2m, electric winder 13 units
    φ 1.0m, electric winder 12 units
    Overhead line winch Hydraulic 5t winder (crawler type) 2 units
    Hydraulic 3t winder (crawler type) 6 units
    Hydraulic drum stand Hydraulic winding type 15 units
    Disassembling type 5 units
    OPGW drum stand Hydraulic type 5 units
    Reel winder Engine-powered 26 units
    Electric-powered 14 units
    Tensing wire winch Hydraulic 3.0t winder (crawler type) 6 units
    Hydraulic 2.5t winder (crawler type) 43 units
    Hydraulic 2.0t winder (crawler type) 32 units
    Hydraulic compressor 100t・200t 37 units
    Metal wheel φ 800, urethane 21 parts
    φ 600, urethane 420 parts
    φ 600×3-wheel, urethane 50 parts
    φ 450, urethane 70 parts
    φ 300, urethane 78 parts
    φ 800, OPGW narrow groove 18 parts
    φ 300, steel plate 44 parts
    Suspension metal wheel, 6-sided 100 parts
    Suspension metal wheel, up-down, 2-wheel 1750 parts
    Windmill carrier 3 types 270 parts
    Metal wheel Crawler-type, OPGW 120 4 units
    Crawler-type, OPGW 300 20 units
    Crawler-type, OPGW 290 13 units
    For tensing wire, φ 90 × 1 wheel 547 parts
    For tensing wire, φ 90 × 2-wheel 314 parts
    For tensing wire, φ 120 × 1 wheel 170 parts
    For tensing wire, φ 120 × 2-wheel 110 parts
    Protector For 1160sq 16 parts
    For 810sq 232 parts
    For 410sq 14 parts
    Steel tower For scaffolding, H=50m 2 groups
    Steel pole For scaffolding, L75 275 sections
    Key lock rope Various types 1 set

    We also rent equipment.

Outdoor wiring work construction results

  • Transmission business

    • Boso line Completed in 2015
    • Nishijobu trunk line Completed in 2014
    • 2nd Hamaoka trunk line Completed in 2004
    • Joetsu thermal power line Completed in 2010
    • Higashi-Nagoya branch line Completed in 2010
    • Towada-Kitakami power trunk line Completed in 2010
  • Transport business

    • Tsukuba Express Completed in 2005
    • Metropolitan Expressway Completed in 2010
    • Tokaido Shinkansen

More Info